Project — Road Construction

Highway 36 Corridor

Home / Projects / Highway 36

Overview

Control and Staking for Live-Traffic Interchange Work

When a Highway 36 interchange added auxiliary lanes and rebuilt two ramps, the prime contractor needed survey control that survived live traffic — plus night-shift staking that never delayed the paving train.

6 mi

Corridor Control

14

Night Staking Shifts

±5mm

Paving Tolerance

Aerial view of the Highway 36 corridor interchange

Challenge

Millimetre Stakes Beside 65-mph Traffic

Paving tolerances allowed just millimetres of error, control points had to survive heavy construction traffic, and all staking windows fell at night when lanes closed.

Approach

Protected Control, Night Crews

We set a braced control network on protected offsets outside the work zone, verified nightly before each shift, and staked paving, barrier and drainage with robotic instruments — feeding machine-control models to the graders.

Final ride smoothness passed on first inspection; as-builts closed the project file.

Road construction site at sunset along the corridor Urban roadway rebuilt with survey control Drone view of a large construction site

Deliverables

Corridor control, night staking, machine models, final as-builts.

Result

Paving passed first inspection; zero survey-caused delays across the season.